For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Earthquake Retrofit Project
04-4J8504
Caltrans
San Mateo, San Mateo County, CA
03/16/2023 at 02:00
This is a bridge project with the typical items of work associated. Myers & Sons Construction, LLC is currently the General Contractor and is requesting quotes from all qualified subcontractors, trucking firms and suppliers including certified DBE firms for any part of the following types of work, including but not limited to:
LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA), ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, TEMPORARY TRAFFIC SCREEN, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY ACTIVE TREATMENT SYSTEM, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, STREAM RESTORATION HYDRAULIC MONITORING, TEMPORARY CREEK DIVERSION SYSTEMS, TREATED WOOD WASTE, REMOVE CONCRETE (SQYD), TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), CHANNEL EXCAVATION, (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE EXCAVATION (TYPE D), (F) - STRUCTURE BACKFILL (BRIDGE), NATIVE BACKFILL, ROADSIDE CLEARING, SOIL AMENDMENT, SLOW-RELEASE FERTILIZER, PLANT (GROUP H), PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, 2" WYE STRAINER ASSEMBLY, TREE WELL SPRINKLER ASSEMBLY, CAM COUPLER ASSEMBLY, (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), PRESSURE REGULATING VALVE, BALL VALVE, MOVE-IN/MOVE-OUT (EROSION CONTROL), IMPORTED TOPSOIL (CY), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, COMPOST SOCK, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), (F) - PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, (F) - STRUCTURAL CONCRETE, BRIDGE FOOTING,, DRILL AND BOND DOWEL, (F) - BAR REINFORCING STEEL (BRIDGE), (F) - ASPHALT MEMBRANE WATERPROOFING, (F) - COLUMN CASING, TRASH NET (END OF PIPE CONNECTION), (F) - CLASS 2 PERMEABLE MATERIAL (BLANKET), REMOVE CONCRETE (CHANNEL), STRUCTURAL ROCK (ROCK GROUP A, PLACEMENT METHOD A), REMOVE SLOPE PAVING (SQYD), STRUCTURAL ROCK (ROCK GROUP B, PLACEMENT METHOD A), STRUCTURAL ROCK (ROCK GROUP C, PLACEMENT METHOD A), SLOPE PAVING (CONCRETE), REMOVE GABION (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ESM-1 (6" D50), PLACEMENT METHOD B, ESM-2, PONDING/ RODDING, CHAIN LINK FENCE (TYPE CL-4), 6' CHAIN LINK GATE (TYPE CL-4), REMOVE CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), DOUBLE MIDWEST GUARDRAIL SYSTEM, SINGLE THRIE BEAM BARRIER, TRANSITION RAILING (TYPE STB), TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT-M), ALTERNATIVE CRASH CUSHION TL-3, CONCRETE BARRIER (TYPE 60M), CONCRETE BARRIER (TYPE 60MF), CONCRETE BARRIER (TYPE 60MS), (F) - CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, REMOVE THERMOPLASTIC TRAFFIC STRIPE, 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 17-7), MOBILIZATION
** All items are open for bid, including items of work normally performed by Myers & Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers & Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages.
Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can also be downloaded through http://ppmoe.dot.ca.gov/des/oe/weekly-ads/specs-ntb.php?c=04-4J8504 and http://ppmoe.dot.ca.gov/des/oe/weekly-ads/plans.php?id=04-4J8504. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.
Pada Vang
Brooke Torres
Telephone
(916) 283-9950
(916) 614-9520
Address
45 Morrison Avenue
Sacramento, CA 95838
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »