Project Name

ARPA Storm Drain Project


Bid/Contract #

Job No. 3697 Bid No. 5500


Awarding Agency

City of Redding


Project Location

Redding, Shasta County, CA


Bid Date

08/12/2024 at 03:00


Project Details

SnL Group, Inc. is seeking quotes from all qualified vendors, subcontractors, service and material providers, including all certified WBE and MBE for the following items of work per plans and specs, including but not limited to: WPCP, Traffic Control, Construction Area Signs, Concrete, Trench Sheeting & Shore, 12" to 30" Storm Drain Pipe, manhole & appurtenances, Catch Basin, Tree Removal, Water Main & appurtenances, aggregate materials, asphalt paving & Striping & trucking.

Scope Includes: replace deteriorated or undersized Storm Drain Facilities at various locations including Churn Creek Road and Harpole Road, Victor Avenue, Placer Street, Wilson Avenue/Belladonna Street easement and Masonic Avenue. Fairway Avenue and Robert Court will be Additive Alternates as shown on the plans.


SnL Group, Inc. is available to discuss breaking out any portion of work to encourage minority participation. MBE & WBE can no longer self-certify, and firms must be certified at bid opening. MBE/WBE Firms must provide CASFR proof of MBE/WBE certification from: The U.S. Environmental Protection Agency (USEPA), The Small Business Administration(SBA), The Department of Transportation's State implemented DBE Certification Program (with U.S. citizenship), Tribal, State and Local governments, and/or Independent private organization certifications. If an entity holds one of these certifications, it is considered acceptable for establishing status under the MBE/WBE Program.

All Subcontractors onsite with diesel equipment must be registered and provide proof of In-Use Off-Road Diesel-Fueled Fleet Regulation, DOORS Certification.

SnL Group, Inc.'s estimator can be reached at the office (530) 222-5048, and is available to provide you with any assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. SnL Group, Inc. may also assist in obtaining any necessary equipment, supplies, materials or related services.

Plans, specifications and project requirements may be reviewed at our office in Redding, CA. They can also be viewed and downloaded online at https://www.cityofredding.gov/_T65_R211.php

Wage Requirements are Prevailing Wage for the State of California, DIR www.dir.ca.gov (https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html).

Insurance Requirements: each subcontractor must submit proof of work comp insurance and obtain work comp throughout the completion of the project. General Liability, Auto and other insurance as required pre the Project Specs.

Requirements: by submitting a proposal, the bidder affirms that they have carefully examine ALL the bidding documents/addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work. SnL's written subcontract documents
execution is required of all successful subcontract bids.

Get in Touch

Outreach Coordinator

Tommi Compton


Telephone

(530) 222-5048


Fax

(530) 222-5140

Address

9818 Holton Way
Redding, CA 96003


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »