DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Desert Knolls Wash PH III Flood Control Improvement Project


Bid/Contract #

System No. 4-201-1A


Awarding Agency

San Bernardino County Flood Control District


Project Location

Apple Valley, San Bernardino County, CA


Bid Date

10/03/2024 at 01:00


Project Details

DBE Subs/Suppliers required include but are not limited to: The work, in general, consists of clearing and grubbing, grading, excavation, backfill; disposal of surplus dirt; removal of rock and concreted rock; removal of existing sewer lines, manholes and appurtenances; removal of existing chain link fences/gates; removal of corrugated steel pipe; grading, construction of concreted rock slope protection; grade stabilization structures; access road and ramps along with various ramps; construction of reinforced concrete box (RCB), head wall; wing wall and cutoff walls; installation of chain link fence/gates; installation of pipe gate; installation of cable railing and metal beam guard railing structures and other work appurtenant thereto. Ames Construction, Inc. will work with subcontractors and suppliers to breakdown items into economical feasible packages and to establish delivery/construction schedules to allow for maximum DBE participation.


Ames will require bidder to provide performance and payment bonds for the full amount of the Subcontract values. Costs of the bonds are to be provided as a separate line item. Please call to discuss how Ames Construction can assist you in your bonding, credit and/or insurance needs. Also, let us know if you need assistance in obtaining necessary equipment, supplies, materials or related assistance or services for this project. Please contact us for more information. Ames’ Subcontract terms and conditions will apply to any contracts resulting from this request. The Subcontractor, by submission of its bid, agrees to the “Terms and Conditions” including all Exhibits and Attachments of Ames Subcontract Agreement. Ames reserves the right to accept or reject any or all quotations. For questions about plans, specifications and other contract requirements please contact our office. Contact info provided below. Bids submitted to Ames in response to this RFQ shall remain open and valid until the contract is executed. Ames Construction, Inc. is an Equal Opportunity Employer.

Please fax quotes to (951) 549-9003 or send by email to CABID@Amesco.com.
Plans and specifications can be viewed and downloaded at: https://ames.sharefile.com/d-sada7e5115ac54dde8cc91d56a3085019

Get in Touch

Outreach Coordinator

Debbie Smulson


Project Estimator

Andrew Lampkin

Telephone

(951) 356-1275


Fax

(951) 549-9003

Address

391 N. Main Street, Ste 302
Corona, CA 92880


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »