For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Painting OR241: Chandler (Coos River) Bridge Project
15573
Oregon Department of Transportation
Coos Bay, Coos County, OR
01/30/2025 at 09:00
TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC; TEMPORARY SIGNS; PORTABLE CHANGEABLE MESSAGE SIGNS; FLAGGERS; FLAGGER STATION LIGHTING; AUTOMATED FLAGGER ASSISTANCE DEVICE; TEMPORARY BARRICADES, TYPE III; TEMPORARY PLASTIC DRUMS; TEMPORARY REMOVABLE TAPE; TEMPORARY NON-REFLECTIVE TAPE; TEMPORARY PAVEMENT BARS; BAR REMOVAL; TEMPORARY BARRIER; TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM; MOVING TEMPORARY IMPACT ATTENUATORS, NARROW SITE SYSTEM; TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED; REPAIR TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM; REPAIR TEMPORARY IMPACT ATTENUATOR, TRUCK MOUNTED; PORTABLE TRAFFIC SIGNAL; TEMPORARY FLASHING BEACONS; EROSION CONTROL; INLET PROTECTION, TYPE 3; SEDIMENT BARRIER, TYPE 3; POLLUTION CONTROL PLAN; WORK CONTAINMENT PLAN; CONTAMINATED SOIL DISPOSAL; REMOVE AND REPLACE TEMPORARY BARRIER; CONSTRUCTION SURVEY WORK; REMOVAL OF STRUCTURES AND OBSTRUCTIONS; ASPHALT PAVEMENT SAWCUTTING; CLEARING AND GRUBBING; GENERAL EXCAVATION; SUBGRADE GEOTEXTILE; DRAINAGE CURBS; BRIDGE REMOVAL WORK; REINFORCEMENT, GRADE 60; DECK CONCRETE, CLASS HPC4500; GENERAL STRUCTURAL CONCRETE, CLASS 3300; STRUCTURAL STEEL MAINTENANCE; GRC CONDUIT SYSTEM, 1 INCH DIAMETER; SOLDIER PILE WALLS; ACCESS GATE; ADDITIONAL FASTENER INSTALLATION; BARRIER GATE; FALL ARREST SYSTEM; MACHINE HOUSE DOOR; RIVET AND BOLT REPLACEMENT; TRAFFIC GATE; AGGREGATE BASE; LEVEL 3, 1/2 INCH ACP MIXTURE; GUARDRAIL TRANSITION; GUARDRAIL TERMINALS, NON-FLARED; GUARDRAIL TERMINALS, FLARED; EXTRA FOR 8 FOOT POSTS; MIDWEST GUARDRAIL SYSTEM, TYPE 2A; MIDWEST GUARDRAIL SYSTEM, TYPE 3; DELINEATORS, TYPE 4 ALTERNATE 2; BRIDGE IDENTIFICATION MARKERS; REMOVE EXISTING SIGNS; REMOVE AND REINSTALL EXISTING SIGNS; WOOD SIGN POSTS; BRIDGE STRUCTURE MOUNTS; SIGNS, STANDARD SHEETING, SHEET ALUMINUM; LUMINAIRES, LAMPS, AND BALLASTS; PERMANENT SEEDING; MAILBOX CONCRETE COLLARS; REMOVE AND REINSTALL MAILBOX SUPPORTS.
F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.
F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.
Plans and specs for this project are available for your review either at our office or online:
https://www.dropbox.com/scl/fo/uam33ndo7bvnx3ms8kvuw/AGqAr0k0zD91SUuQ8ZZ0Ogw?rlkey=aobttqoy278xwl050skbu5rgg&st=wwk2x6uu&dl=0
Mike Kostenko
Jacob Melton
Telephone
(541) 864-1619
(541) 864-1631
Address
217 Bateman Dr.
Central Point, OR 97502
The U.S. Department of Transportation-supported Northwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »