DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Construct & Repair TMS Elements, CSP, RCP & Trenchless Welded Steel Pipe


Bid/Contract #

01-0H6504


Awarding Agency

Caltrans


Project Location

Alton to Del Norte County Line, Humboldt County, CA


Bid Date

06/18/2025 at 02:00


Project Details

LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, CHANNELIZER, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP BARRIER SYSTEM, TEMP PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION TL-3, AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMP EROSION CONTROL BLANKET, TEMP MULCH, TEMP COVER, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP REINFORCED SILT FENCE, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, TEMP CONSTRUCTION ROADWAY, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, MONITORING, REPORTING), TEMP CREEK DIVERSION SYSTEMS, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, AQUATIC SPECIES PROTECTION & RELOCATION, INVASIVE SPECIES CONTROL, REMOVE CONCRETE, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, IMPORTED BORROW, PLANT (GROUP P), PLANT ESTABLISHMENT WORK, WOOD MULCH, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, ROLLED EROSION CONTROL PRODUCT, FIBER ROLLS, COMPOST, INCORPORATE MATERIALS, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, CONCRETE BACKFILL, CONCRETE COLLAR, PLASTIC PIPE, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE, ELLIPTICAL CORRUGATED STEEL PIPE, SLOTTED CORRUGATED STEEL PIPE, NON-PERFORATED STEEL PIPE UNDERDRAIN, CORRUGATED STEEL PIPE DOWNDRAIN, ENTRANCE TAPER, ANCHOR ASSEMBLY, CABLE ANCHORAGE SYSTEM, ANCHOR ASSEMBLY, DRAINAGE INLET MARKER, CORRUGATED STEEL PIPE INLET, CORRUGATED STEEL PIPE ENERGY DISSIPATOR, WELDED STEEL PIPE, STEEL FLARED END SECTION, CONCRETE FLARED END SECTION, TRENCHLESS WELDED STEEL PIPE, PRECAST CONCRETE PIPE INLET, INLET DEPRESSION, ABANDON CULVERT, REMOVE OVERSIDE DRAIN, REMOVE CULVERT, REMOVE SLOTTED CORRUGATED STEEL PIPE, REMOVE DOWNDRAIN, REMOVE INLET, REMOVE HEADWALL, REMOVE PCC APRON, REMOVE CONCRETE FLARED END SECTION, REMOVE FLARED END SECTION, CULVERT SLURRY-CEMENT BACKFILL, CONCRETE, GRAVEL FILTER, ROCK SLOPE PROTECTION, MISC IRON AND STEEL, TEMP FENCE, MARKER, REMOVE MARKER, RESET ROADSIDE SIGN, CABLE RAILING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MODIFYING SIGNAL AND LIGHTING SYSTEMS, MODIFYING CHANGEABLE MESSAGE SIGN SYSTEMS


Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Get in Touch

Outreach Coordinator

Cassie Coppini


Project Estimator

Mark Benzinger

Telephone

(707) 443-6371


Fax

(707) 443-0277

Address

P.O. Box 1006
Eureka, CA 95502


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »