DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

CSP, CMS System, And Structural Concrete


Bid/Contract #

08-1J3104


Awarding Agency

Caltrans District 8


Project Location

Big Bear, San Bernardino County, CA


Bid Date

07/10/2025 at 02:00


Project Details

Empire Equipment Service, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Channelizer (Surface Mounted), Portable Radar Speed Feedback Sign System, Temporary Barrier System, Portable Changeable Message Sign, Temporary Crash Cushion Tl-3,Water Pollution Control Program, Temporary Soil Binder, Temporary Gravel Bag Berm, Temporary Concrete Washout, Treated Wood Waste, Contractor-Supplied Biologist, Natural Resource Protection Plan, Invasive Species Control, Temporary High-Visibility Fence, Clearing And Grubbing, Move-In/Move-Out (Erosion Control), Bonded Fiber Matrix, Rolled Erosion Control Product (Blanket), Class 2 Aggregate Base (Cy), Prime Coat, Hot Mix Asphalt (Type A), Place Hot Mix Asphalt Dike (Type C), Place Hot Mix Asphalt Dike (Type E), Place Hot Mix Asphalt Dike (Type F), Tack Coat, Remove Asphalt Concrete Pavement, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), Structural Concrete, Headwall, Minor Concrete, Minor Concrete (Minor Structure), Furnish Sign Structure (Versatile Truss), Install Sign Structure (Versatile Truss), Aluminum Walkway Grating (Versatile Truss),Concrete Backfill (Pipe Trench), 36" Corrugated Steel Pipe (.138" Thick), 36" Corrugated Steel Pipe Inlet (.168" Thick), 36" Steel Flared End Section, Remove Culver, Remove Inlet, Remove Headwall, Cleaning, Inspecting, And Preparing Culvert, 18" Cured-In-Place Pipeliner, 24" Cured-In-Place Pipeliner, 36" Cured-In-Place Pipeliner, Miscellaneous Iron And Steel, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective-Recessed), Marker (Culvert), Midwest Guardrail System (Steel Post), Midwest Guardrail System (8' Steel Post), Midwest Guardrail System (8' Steel Post) (Embedded In Rock), Vegetation Control (Minor Concrete), Cable Railing, Transition Railing (Type Agt), End Anchor Assembly (Type Sft-M), Alternative In-Line Terminal Tl-3, Buried Post End Anchor (Type B-F), Concrete Barrier Transition, Remove Guardrail, Reconstruct Guardrail, 6" Two-Component Paint Traffic Stripe, Remove Painted Traffic Stripe, 12" Rumble Strip (Asphalt Concrete Pavement), Maintaining Existing Traffic Management System Elements During Construction, Changeable Message Sign System, Camera Systems


All Subcontractors will be required to have & maintain a valid contractors license, Department of Industrial Relations Number & Insurance.

Contract Documents
https://www.dropbox.com/scl/fo/608f6o7xow9cyq96yl8pz/AAxTYn6Sd-Y3k9nuV4PqfMw?rlkey=7kt7vbdzlyadn9j08no6shg96&dl=0

Get in Touch

Outreach Coordinator

Giovanny Marquez


Telephone

(951) 681-1345


Fax

(951) 332-0857

Address

8432 63rd Street
Riverside, CA 92509


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »