For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Port Gardner Storage Facility - Facility Construction Package
UP-3525
City of Everett
Everett, Snohomish County, WA
07/15/2025 at 02:00
Quality Control Testing and Inspection; Janitorial Services; Temp Fencing; Street Sweeping; Final Cleaning; Selective Demolition; Concrete Reinforcing; Structural Metal Framing; Steel Roof Decking; Misc. Metals; Waterproofing; Insulation; Roofing; Doors and Hardware; Overhead Coiling Doors; Glazing; Architectural Specialties; Gypsum Board; Ceramic Tiling; Acoustical Panel Ceilings; Flooring; Painting and Coating; Room-Identification Panel Signage; Bird Control Devices; Plumbing; HVAC; Aggregate Supply; Trucking; Dewatering; TESC BMPs; Stormwater Treatment Equipment; Soil Cement Ground Improvement; Concrete-Filled Steel Piles; Drilled Micro Piles; Asphalt Paving; Chain Link Fences and Gates; TV Inspection of Pipelines; Seismic Restraints for Piping; Piping System Identification; Pipe Insulation
Plans and specifications are available via BXWA: http://www.bxwa.com/bxwa_toc/pub/263/ev56_port_gardener_storage_fac_68440/info.php
You may also contact Jamie Miranda at jmiranda@shimmick.com for a download link or to set up a meeting via Teams to discuss the plans with an estimator. Meetings are held during regular business hours of 8am to 5pm.
Should you require assistance with your bid, please contact our lead estimator Tom Rossman at tom.rossman@shimmick.com.
All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator listed above for assistance with breaking down items of work into economically feasible units, with assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or related assistance. 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. Shimmick Construction's listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with the Subcontractor's price quote. Shimmick Construction requires that Subcontractors and Suppliers price quotes be provided at a reasonable time prior to the bid deadline to enable a complete evaluation. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.
Jamie Miranda
Tom Rossman
Telephone
(707) 410-5070
(000) 000-0000
Address
1 Harbor Center, Suite 200
Suisun City, CA 94585
The U.S. Department of Transportation-supported Northwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »