DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Construction on State Highway in Alameda, Conctra Costa and Solano Counties


Bid/Contract #

04-155004


Awarding Agency

California Department of Transportation


Project Location

Various, Alameda, Contra Costa, Solano Counties County, CA


Bid Date

08/14/2025 at 02:00


Project Details

St. Francis Electric LLC is inviting all DBE subcontractors, vendors, and truckers to provide pricing for their scope of services that align with the following bid items of work. Please provide any questions or requests of information to the email on this invitation.

1 Lead Compliance Plan
2 Level 2 Critical Path Method Schedule
3 Time-Related Overhead (WDAY)
4 Dispute Resolution Board On-Site Meeting
5 Hourly Off-Site Dispute-Resolution-Board-Related Tasks
6 Construction Area Signs
7 Traffic Control System
8 Stationary Impact Attenuator Vehicle
9 Portable Radar Speed Feedback Sign System
10 Portable Changeable Message Sign (EA)
11 Mobile Barrier System
12 Mobile Barrier Trailer
13 Job Site Management
14 Stormwater Pollution Prevention Plan
15 Stormwater Annual Report
16 Temporary Drainage Inlet Protection
17 Street Sweeping
18 Temporary Concrete Washout
19 Worl Area Monitoring (Bridge)
20 Noise Monitoring
21 Temporary High-Visibility Fence
22 Clearing And Grubbing (LS)
23 Roadside Clearing
24 Wood Mulch
25 Check And Test Existing Irrigation Facilities
26 Remove Irrigation Facility
27 Control And Neutral Conductors
28 1" Remote Control Valve
29 1 1/2" Remote Control Valve
30 1" WYE Strainer Assembly
31 1 1/4" WYE Strainer Assembly
32 1 1/2" WYE Strainer Assembly
33 2" WYE Strainer Assembly
34 Pop-Up Sprinkler Assembly (Gear Drive)
35 Riser Sprinkler Assembly
36 1 1/2" Gate Valve
37 2" Gate Valve
38 2 1/2" Gate Valve
39 3" Gate Valve
40 (F) - 3/4" Plastic Pipe (Schedule 40) (Supply Line)
41 (F) - 1" Plastic Pipe (Schedule 40) (Supply Line)
42 (F) - 1 1/4" Plastic Pipe (Schedule 40) (Supply Line)
43 (F) - 1 1/2" Plastic Pipe (Schedule 40) (Supply Line)
44 (F) - 2" Plastic Pipe (Schedule 40) (Supply Line)
45 (F) - 2 1/2" Plastic Pipe (Schedule 40) (Supply Line)
46 (F) - 3" Plastic Pipe (Schedule 40) (Supply Line)
47 1" Ball Valve
48 1 1/2" Ball Valve
49 Move-In/Move-Out (Erosion Control)
50 Hydromulch
51 Fiber Rolls
56 Core Concrete (2")
57 Core Concrete (7")
59 Bridge Removal (Portion), Location A
60 Bridge Removal (Portion), Location B
62 (F) - Miscellaneous Metal
63 (F) - Miscellaneous Metal (Bridge)
64 Maintaining Existing Traffic Management System Elements During Construction
65 Technology Refresh
66 Modifying Existing Electrical Systems
68 Core Concrete (4")
69 Mobilization


We are encouraging quotes from all DBE Subcontractors, Suppliers and Truckers. SFE is willing to breakout any portion of work to encourage DBE participation. St. Francis Electric, LLC. is an equal opportunity employer. We do not discriminate against any subcontractors, vendors, or employees regardless of sex, age, religion, race, sexual orientation, marital status, national origin, military service disabilities, creed, or national origin. If you need any assistance, feel free to contact us with any questions. Please make us aware of any bonding questions & requests you have prior to bid time, and if assistance is needed in these areas.

Get in Touch

Outreach Coordinator

Edgar Murillo


Telephone

(510) 775-3593


Fax

(510) 639-9116

Address

975 Carden Street
San Leandro, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »