DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Install advance warning signs.


Bid/Contract #

04-4AC404


Awarding Agency

California Department of Transportation


Project Location

Petaluma, Sonoma, Santa Rosa, Windsor, Healdsburg, Sebastopol, Cloverdale, Sonoma County, CA


Bid Date

10/14/2025 at 02:00


Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE subcontractors and suppliers for the following items of work including but not limited to: Lead Compliance Plan, Level 2 Critical Path Method Schedule, Time-Related Overhead (Ls), Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Portable Radar Speed Feedback Sign System, Portable Changeable Message Sign (Ls), Automated Flagger Assistance Device Day, Job Site Management, Water Pollution Control Program, Temporary Drainage Inlet Protection, Street Sweeping, Treated Wood Waste, Noise Monitoring, Clearing And Grubbing (Ls), Roadside Clearing, Wood Mulch, Fiber Rolls, Remove Roadside Sign (Wood Post), Item Description, Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Roadside Sign Panel, Furnish Single Sheet Aluminum Sign (0.063"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Unframed), Furnish Single Sheet Aluminum Sign (0.080"-Framed), Metal (Rail Mounted Sign), Roadside Sign - One Post, Roadside Sign - Two Post, Install Sign (Strap And Saddle Bracket Method), Install Roadside Sign Panel On Existing Post, Maintaining Existing Traffic Management System Elements During Construction, Mobilization and all Material Suppliers.


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, California 94550 by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available online at the following URL: https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-4AC404. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Lexi Nava


Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »