DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

13TH STREET COMPLETE STREETS PROJECT


Bid/Contract #

STPL-5137(056)


Awarding Agency

City of Richmond


Project Location

Richmond , Contra Costa County, CA


Bid Date

10/16/2025 at 02:00


Project Details

Mobilization, Clearing, Grubbing, And Tree Protection, Traffic Control And Construction Area Signs, Changeable Message Signs,
Construction Surveys, Water Pollution Control And Swppp, Utility Potholing (Utility Service Lateral And Storm Drain), Utility
Potholing (Third Party Utility Mains) (*), Adjust To Finish Grade (Water Service Meter Box), Adjust To Finish Grade
(Streetlight/Traffic Signal Service Pull Box), Remove Loop Detector Handhole, Remove Tree, Remove Concrete Flatwork, Remove
Surfacing, Base, And Subgrade, Remove And Dispose Post And Salvage Sign(S), Remove Sign(S) And Protect Post, Remove And
Dispose Sign And Post, Trench Drain, Curb Cut And Cobble Channel At Esmond Avenue Northwest Bulbout, Concrete Curb (Type
C), Concrete Curb (Type M3-6), Concrete Curb And Gutter (Type A), Concrete Curb Ramp, Concrete Driveway, Concrete Sidewalk,
Concrete Valley Gutter, Full Depth Base Repair (7-Inch Depth), Cold Milling Asphalt Pavement (3-Inch Depth), Subgrade
Preparation At Roadway Grading, Subgrade Over-Excavation At Roadway Grading And Base Repairs [Revocable], Hot Mix Asphalt
Pavement (3-Inch), Hot Mix Asphalt Pavement (11-Inch), Type II Slurry Seal, Thermoplastic Traffic Striping - Caltrans Detail 9,
Thermoplastic Traffic Striping - Caltrans Detail 22, Thermoplastic Traffic Striping - Caltrans Detail 25, Thermoplastic Traffic
Striping - Caltrans Detail 29, Thermoplastic Traffic Striping - Caltrans Detail 32, Thermoplastic Traffic Striping - Caltrans Detail 38,
Not Used, Thermoplastic Traffic Striping - Caltrans Detail 39, Thermoplastic Traffic Striping - Caltrans Detail 39A, Thermoplastic
Traffic Striping - Caltrans Detail 40, Thermoplastic Limit Line (White), Thermoplastic Yield Line (White), Thermoplastic Yield Line
- Bike (White), Thermoplastic 12" Basic Crosswalk, Thermoplastic Ladder Crosswalk (Standard), Thermoplastic Bike Lane Buffer,
Curb Paint - White Reflective, Curb Paint - Yellow Reflective, Curb Paint - Red, Curb Paint - Blue, Green Marking, Thermoplastic
Markings (White), Thermoplastic Parking "T"s, Furnish And Install Sign And Post, Furnish And Install Sign, Install Salvaged Sign,
Furnish And Install Sign Post And Salvaged Sign, Flexible Channelizers, Armadillos, Blue Fire Hydrant Pavement Marker, Traffic
Signal System Modifications @ 13th Street/ Lincoln Ave (Sheet E-1 To E-2), Traffic Signal System Modifications @ 13th Street/
Rheem Ave (Sheet E-4 To E-5), New Rectangular Rapid Flashing Beacon System @ 13th Street/ Coalinga Ave (Sheet E-3), Trench
And Backfill, 2" PVC Conduit, #6 Awg Stranded Copper Conductor, #6 Awg Bare Solid Conductor (Ground), #5 Pull Box, Install
Conduit In Exist Pull Box (Cb), Circuit Breaker, Contactor, Single Arm Luminaire Pole, Fixture, And Foundation, Tree Establishment
And Maintenance, Tree Planting - 24" Box, Import Planting Soil (Median, Planters) 24" Depth, Soil Preparation (Soil Placement And
Prep), Not Used, Root Barrier (36" Depth), Cobbles, Trainee Worker, Not Used, Concrete Curb (Caltrans Type D-6), Crack Sealing,
Red Pavement Marking, Green-Backed Sharrow Pavement Marking, Caltrans Type D Marker - White Or Yellow and All Material
Suppliers.


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, California 94550 by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available online at the following URL:https://vendors.planetbids.com/portal/14590/bo/bo-detail/134043 . FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Lexi Nava


Project Estimator

Marcus Hanson

Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »