DBEGoodFaith.com


Company Logo

is seeking qualified MBEs, WBEs, MWBEs

Project Name

Port Gardner Storage Facility - Facility Construction Package (Rebid)


Bid/Contract #

UP-3525


Awarding Agency

City of Everett


Project Location

Everett, Snohomish County County, WA


Bid Date

10/21/2025 at 02:00


Project Details

QC Testing and Inspection; Janitorial Services; Temp Fencing; Street Sweeping; Final Cleaning; Selective Demolition; Concrete Reinforcing; Structural Metal Framing; Steel Roof Decking; Misc. Metals; Waterproofing; Insulation; Roofing; Doors and Hardware; Overhead Coiling Doors; Glazing; Architectural Specialties; Gypsum Board; Ceramic Tiling; Acoustical Panel Ceilings; Flooring; Painting and Coating; Room-Identification Panel Signage; Bird Control Devices; Plumbing; HVAC; Aggregate Supply; Trucking; Dewatering; TESC BMPs; Stormwater Treatment Equipment; Soil Cement Ground Improvement; Concrete-Filled Steel Piles; Drilled Micro Piles; Asphalt Paving; Chain Link Fences and Gates; TV Inspection of Pipelines; Seismic Restraints for Piping; Piping System Identification; Pipe Insulation


All items of work listed above are made available, even items of work normally performed by Shimmick. Please contact the lead estimator for assistance with breaking down items of work into economically feasible units, assistance obtaining equipment, supplies, materials, bonding, insurance, estimating, or any additional assistance. Shimmick Construction's listing of a Subcontractor is not to be construed as an acceptance of all of the Subcontractor's conditions or exceptions included with the Subcontractor's price quote.

PLANS AND SPECIFICATIONS: Plans and specifications are available via BXWA: http://www.bxwa.com/bxwa_toc/pub/263/ev58_port_gardner_storage_faci_15848/info.php
You may also contact Jamie Miranda at jmiranda@shimmick.com for a download link or to set up a meeting via Teams to discuss the plans with an estimator. Meetings are held during regular business hours of 8am to 5pm.

SHIMMICK CONTACTS:
Tom Rossman, Lead Estimator, tom.rossman @shimmick.com
Jamie Miranda, Estimating Coordinator, jmiranda@shimmick.com

ADDITIONAL INFORMATION: 100% Performance and Payment bonds with a surety company subject to approval of Shimmick Construction Company, Inc. are required of subcontractors for this project. Shimmick Construction will pay bond premium up to 1.5%. Subcontractors will be required to abide by terms and conditions of the AGC Master Labor Agreements and to execute an agreement utilizing the latest SCCI Long Form Standard Subcontract incorporating prime contract terms and conditions, including payment provisions. For assistance with bonding, insurance or lines of credit contact Todd Yoder at todd.yoder@shimmick.com.


QUOTES: Please submit quotes via email to jmiranda@shimmick.com and tom.rossman @shimmick.com

Get in Touch

Outreach Coordinator

Jamie Miranda


Project Estimator

Tom Rossman

Telephone

(707) 410-5070


Fax

(000) 000-0000

Address

1 Harbor Center, Suite 200
Suisun City, CA 94585


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Northwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »