For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Washington Manor Park Frontage Improvement
2025.3401
City of San Leandro
San Leandro , Alameda County, CA
02/04/2026 at 03:00
BD Vanguard Construction, Inc. is requesting quotes from all San Leandro Local Businesses Mobilization (Max 10% of total base bid), Traffic Control / Pedestrian Control, Water Pollution Control Work, Clearing, Grubbing, and Tree Protection, Conform Landscaping, Remove Asphalt Flatwork, Grind Asphalt Flatwork, Remove Concrete Flatwork, Remove Sign and Post, Remove Bike Corral, Remove Bollard, Remove and Install Trash Receptacle, Remove and Install Recycling Receptacle, Remove and Install Dog Bay Dispenser, Remove and Install Roadside Sign, Remove and Install Irrigation Box, Concrete Sidewalk, Concrete Island, Concrete Curb, Hot Mix Asphalt (4-inch), Class 2 Aggregate Base (6-inch), Speed Hump, Handrails, Bollards, Wheel Stops (3-feet and 6-feet), Bike Rack, Truncated Domes, Asphalt Resurfacing/Coat - Overkote, White Crosswalk Striping, White Parking Striping, Blue Parking Striping, Emergency Vehicle Striping, Roadside Sign, Custom Roadside Sign, 2nd Coat of Asphalt Sealant - Overkote and all Material suppliers.
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, California 94550 by appointment or you can send a request for this project and we will send you the specs/plans. Plans and specifications are also available online at the following URL:https://www.sanleandro.org/bids.aspx?bidID=94. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Lexi Nava
Marcus Hanson
Telephone
(925) 245-1300
(925) 245-1244
Address
550 Greenville Road
Livermore, CA 94550
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »