Project Name

Pilot Point WWTP Improvements - Work Package #03 - Electrical, I&C


Bid/Contract #

225150-06


Awarding Agency

City of Pilot Point


Project Location

Pilot Point, Denton County, TX


Bid Date

03/18/2026 at 02:00


Project Details

Posillico Civil, Inc is actively seeking proposals from qualified Women‑Owned Business Enterprises (WBE) and Minority‑Owned Business Enterprises (MBE) for participation in the Pilot Point Wastewater Treatment Plant (WWTP) Improvements Project, Package 3- ELECTRICAL & I&C

Scope of Work Includes:
PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION NECESSARY TO FURNISH AND INSTALL COMPLETE ELECTRICAL AND I&C SYSTEMS PER PLANS AND SPECIFICATIONS.
INSTRUMENTATION & CONTROLS (I&C): PRIME CONTROLS, LP WILL BE CONTRACTED TO PROVIDE ALL I&C PROGRAMMING AND COMMISSIONING SERVICES.
COORDINATE ALL ACTIVITIES WITH THE CMAR AND OTHER WORK PACKAGE CONTRACTORS TO MAINTAIN SCHEDULE AND INSTALLATION ALIGNMENT.
PROVIDE AND MAINTAIN TEMPORARY ELECTRICAL POWER FOR THE JOBSITE, INCLUDING ELECTRICAL CONNECTIONS TO SIX (6) CONSTRUCTION TRAILERS AND TWO (2) OR MORE POWER DROPS AS REQUIRED; COORDINATE WITH THE CITY AND/OR SERVING UTILITY. ELECTRICAL CONTRACTOR TO REMOVE ALL TEMPORARY INSTALLATIONS AT PROJECT COMPLETION. (ELECTRICAL METER USAGE COSTS PAID BY CMAR.)
FURNISH ONE ROLL-OFF MOVER (ROLLOFFCADDY) (48V, 23,000-LB CAPACITY) OR APPROVED EQUAL AND PROVIDE ALL REQUIRED POWER, WIRING, AND CHARGING EQUIPMENT PER CONTRACT DOCUMENTS.
FURNISH, ASSEMBLE, INSTALL, AND COMMISSION A 1,750 KW GENERATOR, INCLUDING ALL REQUIRED ELECTRICAL AND INSTRUMENTATION SYSTEMS, FUEL, SERVICING, AND MAINTENANCE UNTIL FINAL ACCEPTANCE.
FURNISH, INSTALL, AND TEST VARIABLE FREQUENCY DRIVES (VFDS) AS FOLLOWS:
FEB RETURN LIFT STATION - TWO (2)
SLUDGE PUMPS - TWO (2)
INFLUENT LIFT STATION - FOUR (4)
UV SYSTEM (VTPS) - TWO (2)
OBTAIN AND COORDINATE ALL REQUIRED PERMITS, INSPECTIONS, CERTIFICATES, AND APPROVALS FOR PERMANENT POWER INSTALLATIONS.
PERFORM STARTUP, FUNCTIONAL TESTING, COMMISSIONING, AND OPERATOR TRAINING FOR ALL APPLICABLE SYSTEMS AND EQUIPMENT.
RESTORE ALL DISTURBED AREAS AND UTILIZE THE BORROW AREA FOR BACKFILL OR DISPOSAL OF CLEAN SPOILS, AS PERMITTED.
LIGHTNING PROTECTION AS IDENTIFIED IN THE SPECIFICATIONS
FURNISH AND INSTALL A COMPLETE SECURITY SYSTEM, INCLUDING ALL DEVICES, CABLING, TERMINATIONS, PROGRAMMING, TESTING, AND COMMISSIONING IN COMPLIANCE WITH APPLICABLE CODES.
NETA TESTING OF ELECTRICAL EQUIPMENT AS IDENTIFIED IN THE SPECIFICATIONS
EXCAVATION & CIVIL WORK FOR ELECTRICAL DUCT BANKS, EQUIPMENT HOUSEKEEPING PADS, AND ADDITIONAL FORMED CONCRETE THROUGHT THE PLANT (I.E. LIGHT POLE BASES).


Project plans and specs are available on the Civcast website:

https://www.civcastusa.com/project/69933da19360e3c4833e8084/summary

Please reference the spec book for insurance requirements.

Get in Touch

Outreach Coordinator

Estimating Team


Project Estimator

Alex Perez

Telephone

(512) 297-2397


Fax

(000) 000-0000

Address

2101 S IH-35 suite 500
Austin, TX 78741


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Gulf Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »