DBEGoodFaith.com


Company Logo

is seeking qualified MBEs, WBEs

Project Name

Dam Road Roundabout


Bid/Contract #

2026(1)


Awarding Agency

City of Clearlake


Project Location

Clearlake, Lake County, CA


Bid Date

05/07/2026 at 03:00


Project Details

Green Thermoplastic Pavement Marking, Landscape Preservation, Lead Compliance Plan, Traffic Control, Temp Drainage Inlet Protection, Remove Thermoplastic Striping, Clear & Grub, Roadway Excavation, Import Borrow, Rock Blanket, Soil Amendment, Organic Fertilizer, Soil Testing, Plants & Maintain Planted Areas, Plant Establishment Work, Gravel Mulch, Test Irrigation Facilities, Control & Neutral Conductors (Amor-Clad), Remote Control Valves, Irrigation Controller, Plastic Pipe, Backflow Preventer (Assembly, Enclosure, Blanket), Flow Sensor, Riser Sprinkler Assembly, Gate Valve, Ball Valve, PVC Pipe Conduit, Quick Coupler Valve, Compost, Imported Soil, Art Wall, Agg Base, Hot Mix AC, Tack Coat, Cold Plance AC, Remove Base & Surfacing, COC Curb Opening Storm Drain Catch Basin, COC Storm Drain Manhole, COC Area Drain Drop Inlet, Reinforce Concrete Pipe, Drainage Inlet Marker, Abandon Culvert, Remove Pipe, Adjust Manhole, Modify Inlet to Manhole, CAP Inlet, Minor Concrete, Detectable Warning Surface, Remove Concrete, Lighting, Adjust Sanitary Sewer Cleanout Box, Adjust Water Valve, Remove Pavement Markers, Roadside Signs (Remove, Reset, Install), Pavement Markers, Thermoplastic Striping, Remove Thermoplastic Striping, Electric Service for Irrigation, Remove Light System, New PG&E Service & Pedestal Enclosure, Underground Pull Box


Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail bids@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Get in Touch

Outreach Coordinator

Cassie Coppini


Project Estimator

Alex Hunt

Telephone

(707) 443-6371


Fax

(707) 443-0277

Address

P.O. Box 1006
Eureka, CA 95502


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »