DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

RECHARGE MASTER PLAN UPDATE (RMPU) BASIN IMPROVEMENTS PROJECT MONTCLAIR BASIN IMPROVEMENTS


Bid/Contract #

Contract/Bid #: FB-JV-26-015 / RW15003.03


Awarding Agency

Inland Empire Utilities Agency


Project Location

Montclair, San Bernardino County, CA


Bid Date

11/05/2026 at 02:00


Project Details

Granite Construction Company is seeking certified and qualified DBE subcontractors and/or suppliers to provide for the following items of work, including but not limited to: B1420 Crushed & Broken Stone, C0652 Reinforcing Bar Section Supplier, C0657 Lumber Supplier, C0672 Storm Water Systems Supplier, C0680 Fencing Supplier, C0698 Building Material Supplier , C1211 Traffic Flagger, C1290 Temporary Railing (Type K), C1601 Clearing & Grubbing, C1980 Imported Borrow, C2000 Highway Planting, C2030 Erosion Control, C2602 Aggregate Base (Ab), C3901 Asphalt Concrete, C5100 Concrete Structure, C5105 Minor Concrete Structure, C5110 Concrete Surface Finish, C5201 Reinforcing Steel, C6500 Reinforced Concrete Pipe, C7200 Rock Slope Protection, C7500 Misc Iron & Steel Frame, Cover & Grate, C8000 Fencing, C8001 Temporary Fencing , C8710 Engineering , C8760 Land Surveyor, C9602 Bottom Dump Trucking, C9603 Transfer Dump Truck, C9604 Super 10 Dump Truck, C9605 Flat Bed Trucking, C9606 Water Truck , C9607 End Dump Truck , C9609 Street Sweeping Truck , C9857 Low Voltage Electrical Systems, C9859 Commercial Electrical, C9860 Water Meter & Temp Facilities, C9905 Cutting, C9908 Heavy Equipment Rental

Construct improvements at Montclair Basins 2 and 3 to divert available storm flows from the San Antonio Creek Channel into the existing basins for groundwater recharge.
1. Install two diversion structures (drop inlets) in the San Antonio Creek Channel to redirect flow to Montclair Basins 2 and 3.
2. Construct each structure across the full width of the 25-foot concrete channel.
3. Excavate 8-10 feet below the channel floor to form each structure (approx. 8 ft × 25 ft).
4. Install steel grates over the structures to prevent large debris entry.
5. Provide wall-mounted steel gates on the east side of each structure.
6. Install 4-foot-diameter discharge pipelines from each structure to the basins 2 and 3.
7. Route piping across the gravel access road and basin slopes.
8. Construct concrete outlet structures in the basins for flow dissipation.
9. Install piping along basin slopes and cover with 3 feet of soil.
10. Provide all electrical, instrumentation, and SCADA controls integration required to actuate the Basin 2 and Basin 3 gates; programming shall be performed by one of the two approved controls integrators, Technical Systems, Inc. (TSI) or E Technologies Group


Plans and specifications can be accessed at no cost at: Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03 or https://www.dropbox.com/scl/fo/otmi58sol2cmke5albjll/AIfXYXJEe-r98hOONs1FaOk?rlkey=wi87vj8f026xqv6uyk4r5a69t&st=d90spnbk&dl=0

Additionally Granite is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into any economically feasible packages.  We welcome quotes from qualified Minority Business Enterprise (MBE), Women Business Enterprises (WBE), Small Business Enterprises (SBE), Disadvantaged Business Enterprises (DBE) and other entities defined as economically disadvantaged.

Assistance in obtaining bonding, insurance, equipment, materials, and/or supplies is available upon request.  Additionally, please contact us if you require any technical assistance.  Quotations must be valid for same duration as specified by Owner for contract award.  Granite intends to work cooperatively with all qualified firms seeking work on this project.

In addition to request for participation from Certified DBE/SBE/MBE subcontractors and suppliers, Granite requests non-DBE subcontractors to provide lower-tier DBE subcontractor and/or supplier participation. Bidders are encouraged to indicate lower-tier DBE participation, as it will be evaluated as part of their quote.

Please include your Contractor License Number and DIR Registration Number on your quote

Granite Construction Company is signatory to Operating Engineers, Laborers, Cement Masons Teamsters and Carpenters unions.  Granite may require 100% performance and payment bonds for the full amount of subcontract price.  Granite Construction will assist with bonding costs for subcontractors. Additionally, The US Small Business Administration may also assist you in obtaining bonding, for more information please visit them at http://www.sba.gov .  Subcontractors must possess a current contractor's license, DIR number, insurance, and worker's compensation coverage meeting Granite's requirements.  All quotes are subject to the terms of Granite Construction Company's applicable standard form agreement which is available through the following link: https://www.graniteconstruction.com/ca-resources/standard-agreements

Get in Touch

Outreach Coordinator

Kelli Osborn


Project Estimator

Andrew Burk - andrew.burk@gcinc.com - (661) 478-1239

Telephone

(760) 775-7500


Fax

(775) 775-8229

Address

38000 Monroe Street
Indio, CA 92203


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »