DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Construct Soldier Pile Ground Anchor Walls, Widen Shoulder with HMA


Bid/Contract #

01-0J4104


Awarding Agency

State of California Department of Transportation - Caltrans


Project Location

Near Willow Creek, Humboldt County, CA


Bid Date

11/03/2022 at 02:00


Project Details

J. F. Shea Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for all items of work, including but not limited to:
1 LEAD COMPLIANCE PLAN
2 LEVEL 2 CRITICAL PATH METHOD SCHEDULE
3 TIME-RELATED OVERHEAD (LS)
4 DISPUTE RESOLUTION BOARD ON-SITE MEETING
5 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS
6 DEVELOP WATER SUPPLY
7 CONSTRUCTION AREA SIGNS
8 TRAFFIC CONTROL SYSTEM
9 TEMPORARY PAVEMENT MARKING (PAINT)
10 TEMPORARY TRAFFIC STRIPE (PAINT)
11 CHANNELIZER (SURFACE MOUNTED)
12 PORTABLE SIGNAL SYSTEMS (EA)
13 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS)
14 TEMPORARY BARRIER SYSTEM
15 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
16 ALTERNATIVE TEMPORARY CRASH CUSHION
17 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY
18 JOB SITE MANAGEMENT
19 PREPARE STORM WATER POLLUTION PREVENTION PLAN
20 RAIN EVENT ACTION PLAN
21 STORM WATER SAMPLING AND ANALYSIS DAY
22 STORM WATER ANNUAL REPORT
23 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
24 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
25 TEMPORARY COVER
26 TEMPORARY CHECK DAM
27 TEMPORARY DRAINAGE INLET PROTECTION
28 TEMPORARY FIBER ROLL
29 TEMPORARY GRAVEL BAG BERM
30 TEMPORARY REINFORCED SILT FENCE
31 TEMPORARY SILT FENCE
32 TEMPORARY CONSTRUCTION ENTRANCE
33 STREET SWEEPING
34 TEMPORARY CONCRETE WASHOUT
35 WATER QUALITY SAMPLING AND ANALYSIS DAY
36 WATER QUALITY MONITORING REPORT
37 WATER QUALITY ANNUAL REPORT
38 ASBESTOS COMPLIANCE PLAN
39 TREATED WOOD WASTE
40 CONTRACTOR-SUPPLIED BIOLOGIST (LS)
41 INVASIVE SPECIES CONTROL
42 DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS)
43 TEMPORARY HIGH-VISIBILITY FENCE
44 CLEARING AND GRUBBING (LS)
45 ROADWAY EXCAVATION
46 ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS)
47 ROADWAY EXCAVATION (TOPSOIL)
48 ROCK EXCAVATION
49 ROCK EXCAVATION (NATURALLY OCCURRING ASBESTOS)
50 STRUCTURE EXCAVATION (NATURALLY OCCURRING ASBESTOS)
51 STRUCTURE EXCAVATION (SOLDIER PILE WALL, NATURALLY OCCURRING ASBESTOS)
52 STRUCTURE EXCAVATION (CULVERT) (NATURALLY OCCURRING ASBESTOS)
53 (F) - STRUCTURE EXCAVATION (SOLDIER PILE WALL)
54 (F) - STRUCTURE BACKFILL (SOLDIER PILE WALL)
55 SODIUM BENTONITE CLAY
56 (F) - CONCRETE BACKFILL (SOLDIER PILE WALL)
57 (F) - LEAN CONCRETE BACKFILL
58 DITCH EXCAVATION
59 SOIL AMENDMENT
60 ORGANIC FERTILIZER
61 PLANT (GROUP B)
62 PLANT ESTABLISHMENT WORK
63 WOOD MULCH
64 FOLIAGE PROTECTOR
65 TEMPORARY IRRIGATION SYSTEM
66 MOVE-IN/MOVE-OUT (EROSION CONTROL)
67 HYDRAULIC BIOTIC GROWTH MEDIUM
68 FIBER REINFORCED MATRIX
69 FIBER ROLLS
70 COMPOST (CY)
71 INCORPORATE MATERIALS
72 HOT MIX ASPHALT (TYPE A)
73 RUBBERIZED HOT MIX ASPHALT (GAP GRADED)
74 ASPHALT BINDER (GEOSYNTHETIC PAVEMENT INTERLAYER)
75 GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC)
76 PLACE HOT MIX ASPHALT DIKE (TYPE C)
77 PLACE HOT MIX ASPHALT DIKE (TYPE E)
78 PLACE HOT MIX ASPHALT DIKE (TYPE F)
79 TACK COAT
80 REMOVE ASPHALT CONCRETE DIKE
81 COLD PLANE ASPHALT CONCRETE PAVEMENT
82 GROUND ANCHOR (SUBHORIZONTAL)
83 STEEL SOLDIER PILE (HP 14 X 89)
84 30" DRILLED HOLE
85 (F) - STRUCTURAL CONCRETE, WALER
86 (F) - STRUCTURAL CONCRETE, BARRIER SLAB
87 (F) - STRUCTURAL CONCRETE, LAGGING
88 (F) - STRUCTURAL CONCRETE, HEADWALL
89 (F) - STRUCTURAL CONCRETE, DRAINAGE INLET
90 (F) - MINOR CONCRETE (MINOR STRUCTURE)
91 (F) - PRECAST CONCRETE LAGGING
92 (F) - BAR REINFORCING STEEL
93 (F) - BAR REINFORCING STEEL (WALER, EPOXY COATED)
94 (F) - BAR REINFORCING STEEL (LAGGING, EPOXY COATED)
95 CLEAN AND PAINT STEEL SOLDIER PILING
96 24" REINFORCED CONCRETE PIPE
97 24" CORRUGATED STEEL PIPE (.109" THICK)
98 FURNISH AND INSTALL DRAIN PIPE (HORIZONTAL DRAIN)
99 DRILL HOLE (HORIZONTAL DRAIN)
100 (F) - PERMEABLE MATERIAL (BLANKET)
101 24" CORRUGATED STEEL PIPE ENERGY TEE DISSIPATOR (.109" THICK)
102 24" CONCRETE FLARED END SECTION
103 INLET DEPRESSION
104 REMOVE CULVERT (LF)
105 REMOVE DOWNDRAIN (EA)
106 REMOVE INLET
107 REMOVE HEADWALL
108 REMOVE FLARED END SECTION (EA)
109 CONCRETE (DITCH LINING)
110 GRAVEL FILTER
111 ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY)
112 ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY)
113 ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY)
114 ROCK SLOPE PROTECTION FABRIC (CLASS 8)
115 (F) - MISCELLANEOUS IRON AND STEEL
116 PREPARE AND STAIN CONCRETE
117 OBLITERATE SURFACING
118 REMOVE PAVEMENT MARKER
119 REMOVE DELINEATOR
120 DELINEATOR (CLASS 1)
121 PAVEMENT MARKER (RETROREFLECTIVE-RECESSED)
122 MILEPOST MARKER
123 MARKER (CULVERT)
124 TREATMENT BEST MANAGEMENT PRACTICE MARKER
125 OBJECT MARKER (TYPE P)
126 REMOVE ROADSIDE SIGN (WOOD POST)
127 REMOVE ROADSIDE SIGN PANEL
128 RESET ROADSIDE SIGN (WOOD POST)
129 RELOCATE ROADSIDE SIGN-ONE POST
130 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED)
131 INSTALL ROADSIDE SIGN PANEL ON EXISTING POST
132 MIDWEST GUARDRAIL SYSTEM (8' STEEL POST)
133 RAIL ELEMENT WALL (LF)
134 VEGETATION CONTROL (MINOR CONCRETE)
135 (F) - TUBULAR BICYCLE RAILING (MODIFIED)
136 (F) - CABLE RAILING
137 TRANSITION RAILING (TYPE WB-31)
138 END ANCHOR ASSEMBLY (TYPE SFT-M)
139 ALTERNATIVE IN-LINE TERMINAL SYSTEM
140 (F) - CONCRETE BARRIER (TYPE 842 MODIFIED)
141 REMOVE GUARDRAIL
142 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY)
143 REMOVE THERMOPLASTIC TRAFFIC STRIPE
144 6" RUMBLE STRIP (SINUSOIDAL)
145 CENTERLINE RUMBLE STRIP (SINUSOIDAL)
146 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED)
147 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED, BROKEN 12-3)
148 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (RECESSED, BROKEN 36-12)
149 INSTALL PULL BOX AND CONDUIT
150 MOBILIZATION


J. F. Shea Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractor’s license, insurance coverage and worker’s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400 Clear Creek Road, Redding, Ca. 96001 or call for any additional needed project information. J. F. Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Employees are encouraged to apply.

J. F. SHEA CONSTRUCTION, INC.
P.O. Box 494519 - Redding, CA 96049
Phone: (530) 246-4292 Fax: (530) 246-9940
An Equal Opportunity Employer

Get in Touch

Outreach Coordinator

Stacy Dutra


Project Estimator

Brock Kernaghan

Telephone

(530) 246-4292


Fax

(530) 246-9940

Address

17400 Clear Creek Rd.
Redding, CA 96001


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »