DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Construct concrete barrier and modify ramp metering system


Bid/Contract #

06-1C7404


Awarding Agency

California Department of Transportation


Project Location

Fresno, Fresno County, CA


Bid Date

10/18/2022 at 02:00


Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following items of work including but not limited to: Lead Compliance Plan, Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Temporary Barrier System, Portable Changeable Message Sign, Temporary Crash Cushion Module, Prepare Water Pollution Control Program, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Street Sweeping, Temporary Concrete Washout, Treated Wood Waste, Clear & Grub, Roadway Excavation, Wood Mulch, Check And Test Existing Irrigation Facilities, Operate Existing Irrigation Facilities, Remove Asphalt Concrete Dike, Structural Concrete (Barrier Slab), Remove Roadside Sign, Furnish Single Sheet Aluminum Sign, Roadside Sign, Concrete Barrier (Type 60Ms), Concrete Barrier Transition, Remove Guardrail, Modifying Ramp Metering Systems, Ready Mix Concrete, and All Material Suppliers.

Engineers Estimate: $900,000.00
DBE Goal: 22%
Job Duration: 45 WD


A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Bid documents are also available on the Caltrans website at the following link:
http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=06-1C7404. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.

Get in Touch

Outreach Coordinator

Erin Hutchison


Project Estimator

Jason Muller

Telephone

(925) 245-1300


Fax

(925) 245-1244

Address

550 Greenville Road
Livermore, CA 94550


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »