For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
MWRA - Deer Island Treatment Plant Clarifier Rehabilitation, Phase II
7395
Massachusetts Water Resources Authority
Winthrop, Suffolk County, MA
01/11/2023 at 14:00
The work includes, but is not limited to replacement/repair of: the influent, effluent and dewatering gates, channel aeration piping system, concrete tank walls and ceilings, clarifier chain drive systems, Primary Effluent Cross Channel gate actuators, Return Sludge Vent Overflow piping; Primary Clarifier intermediate level hatches, headshafts and bearings, Primary Influent Channel Linabond; and the installation of new 480V service receptacles.
FILED SUB-BIDS will be required for the following scopes: Miscellaneous and Ornamental Iron; Waterproofing, dampproofing, and Caulking; Painting; and Electrical. Filed Sub-Bids are due directly to the MWRA by 11:30 AM, November 30, 2022 via the MWRA Supplier Portal (https://supplier.mwra.com).
MWDBE Participation Goals: 4.2% D/MBE & 4.5% D/WBE
Project Documents: You can access the project plan room via Smartbid.
Smartbid Planroom: https://securecc.smartinsight.co/#/PublicBidProject/674120
Correena Keil
(781) 793-9988
(000) 000-0000
Address
100 River Ridge Drive, Suite 103
Norwood, MA 2062
The U.S. Department of Transportation-supported Northeast Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »