DBEGoodFaith.com


Company Logo

is seeking qualified DBEs, MBEs, WBEs

Project Name

MWRA - Deer Island Treatment Plant Clarifier Rehabilitation, Phase II


Bid/Contract #

7395


Awarding Agency

Massachusetts Water Resources Authority


Project Location

Winthrop, Suffolk County, MA


Bid Date

01/11/2023 at 14:00


Project Details

The work includes, but is not limited to replacement/repair of: the influent, effluent and dewatering gates, channel aeration piping system, concrete tank walls and ceilings, clarifier chain drive systems, Primary Effluent Cross Channel gate actuators, Return Sludge Vent Overflow piping; Primary Clarifier intermediate level hatches, headshafts and bearings, Primary Influent Channel Linabond; and the installation of new 480V service receptacles.

FILED SUB-BIDS will be required for the following scopes: Miscellaneous and Ornamental Iron; Waterproofing, dampproofing, and Caulking; Painting; and Electrical. Filed Sub-Bids are due directly to the MWRA by 11:30 AM, November 30, 2022 via the MWRA Supplier Portal (https://supplier.mwra.com).

MWDBE Participation Goals: 4.2% D/MBE & 4.5% D/WBE


Project Documents: You can access the project plan room via Smartbid.
Smartbid Planroom: https://securecc.smartinsight.co/#/PublicBidProject/674120

Get in Touch

Outreach Coordinator

Correena Keil


Telephone

(781) 793-9988


Fax

(000) 000-0000

Address

100 River Ridge Drive, Suite 103
Norwood, MA 2062


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Northeast Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »