DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

Truckee Tahoe Airport Reconstruct Runway 2-20 with Airfield Marking and Lighting


Bid/Contract #

3-06-0262-046-2023


Awarding Agency

Truckee Tahoe Airport District


Project Location

Truckee, Tahoe County, CA


Bid Date

03/29/2023 at 13:00


Project Details

Hat Creek Construction & Materials, Inc. (HCCMI) is seeking quotes from all qualified subcontractors/ suppliers including but not limited to DBE firms for ALL project items of work (see project specs). This includes aggregate, Full Depth Recycling, trucking, electrical, lighting, pulverizing, excavation, and clearing and grubbing. Items of work: SWPPP Implementation and monitoring, mobilization, marking and lighting of closed Airport, Clearing and Grubbing, Unclassified Excavation, Muck Excavation, Imported fill, Scarify and Recompact Subgrade, Subbase Course, Geogrid, In-Place Full Depth Recycled Asphalt Aggregate Subbase Course, Pulverizing and Mixing, In-Place Full Depth Recycled (FDR) Asphalt Aggregate Subbase Course, Regrade and Recompact, In-Place Full Depth Recycled Asphalt Aggregate Subbase Course Excavate, Haul, Place, and Compact, Mill Existing Asphalt Pavement, Crushed Aggregate Base Course (P-209), Scarify and Recompact Existing , Aggregate Base Course (P-209), Asphalt Surface Course (P-401), Emulsified Asphalt Prime Coat (P-602), Emulsified Asphalt Tack Coat (P-603), Surface Preparation " Marking Removal with Fog Seal (P-620), Marking (P-620), Reflective Media (P-620), 12-inch High-Density Polyethylene (pipe), 12-inch Plastic Flared End Sections (D-701), Rip Rap (D-701), No. 8 AWG, 5 kV, L-824, Type C Cable, Installed in Conduit (L-108), No. 2 AWG, Solid Bare Copper Counterpoise Wire, Installed Above Duct Bank or Conduit (L-108), No. 6 AWG, Stranded THWN-2 Equipment Ground, Installed in Conduit (L-108), Installation of Equipment Within Existing Vault, in Place (L-109), Non-Encased Electrical Conduit - 1-way, 2-inch (L-110), Concrete Encased Electrical Conduit - 1-way, 2-inch (L-110), Concrete Encased Electrical Conduit - 2-way, 3-inch (L-110), Slurry Encased Duct Bank, 4-way/4-inch Communication and 4-way/4-inch Electrical, 3-inch Directional Bore Electrical Conduit, Electrical Junction Structure L-867, Class 1,Size B, with Steel Lid and Concrete Collar (L-115), Electrical Junction Structure L-867, Class 1,Size D, with Steel Lid and Concrete Collar(L-115), Electrical Junction Structure L-868, Class 1,Size B, with Steel Lid, Snow-Plow Ring and Concrete Collar (L-115), Electrical Junction Structure 2’ x 3’ (L-115), Electrical Demolition, New Retroreflective Marker, L-853 (L-125), L-861 Runway Edge Lights on L-867 Base, Complete (L-125), L-861E Runway Threshold Lights on L-867 Base, Complete (L-125), L-850C Flush Mounted Runway Edge Lights on L-868 Base with Snow-Plow Ring, Complete (L-125), L-861T Taxiway Edge Lights on L-867 Base, Complete (L-125), New Solar Taxiway Edge Lights, Replace Existing L-830 Transformers on Existing Fixtures (L-125), Remove and Relocate Existing Lighted Guidance Sign on New Sign Pad, including New Transformer and Lamps (L-125), and Furnish and Install New Guidance Sign on New Sign Pad, L-858Y, Size 1, Style 2, 2 Character, 1 Module (L-125).


HCCMI is an equal opportunity employer and is willing to work with all qualified firms interested on this project. Subcontractors must possess a current contractor’s license, insurance coverage and worker’s compensation for the entire length of the contract. If qualified firms need assistance in obtaining project plans, specifications, or requirements please contact estimating@hatcreekconstruction.com or our office at (530) 355-55 can also be viewed at 24339 State Highway 89 North, Burney, CA 96013. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bond may be required.

Link to Project Plans and Specs: https://1drv.ms/u/s!ApcobrwtX5MTjWnltRzVeuCq0wH0?e=j4fOkC

Please call if you need assistance obtaining insurance, bonding, equipment, materials, and/or supplies. HCCMI intends to work cooperatively with all qualified firms seeking work on this project. We will work with any interested subcontractor/supplier to identify opportunities to break items into economically feasible packages.

Get in Touch

Outreach Coordinator

Gilberto Aceves


Project Estimator

Tony Bolman

Telephone

(530) 335-5501


Fax

(530) 335-5510

Address

24339 State Highway 89 North
Burney, CA 96013


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »