For Primes & Gov't
For DBEs, VetBiz, etc.
We're Here to Help
Secondary Clarifier No. 2 Rehabilitation Project
--
South Tahoe Public Utility District
South Lake Tahoe, El Dorado County, CA
03/28/2023 at 02:00
South Tahoe Public Utility District �" Secondary Clarifier No. 2 Rehabilitation Project, South Lake Tahoe, CA. The work to be performed consists of but is not limited to: rehabilitation of Secondary Clarifier No. 2 at the STPUD Wastewater Treatment Plant including mechanical, structural, electrical, and instrumentation improvements. This includes demolition of the existing sludge collector mechanism and replacement with a new sludge collector mechanism and appurtenances; seismic retrofits and rehabilitation of the existing concrete tanks; replacement of existing secondary clarifier handrail and V-notch weirs; installation of new density current baffles; demolition and replacement of existing RAS piping; new clarifier drive in existing MCC; integration of new sludge collector mechanism controls to the PLC; and site civil improvements including excavation, grading, and paving as required to accommodate new improvements. Major materials have already been procured by the District such as the sludge collector mechanism, baffles, covers, and weirs. Vinciguerra Construction, Inc. is seeking quotes for all qualified subcontractors and suppliers including certified DBE, UDBE, WBE, MBE, SBE Firms for the following items of work included but not limited to: Project Consultants, Demolition, Sawcutting Vertical/Flat-Coring, Concrete Rehabilitation, Miscellaneous Metals, Grout Supply/Placement, RAS Piping Supply/Install, Electrical, Instrumentation, Earthwork/Grading, Reinforcing Steel Furnish/Placement, Erosion Control Furnish/Placement, Dewatering, Sheeting, Shoring and Bracing, Concrete Specialties, Epoxy Grout Furnish and Placement, Crack Repairs, Bonded fiberglass reinforced plastic, Cellular Concrete Fill, Asphalt Concrete Furnish/Placement, Aggregate Furnish/Placement, Minor Concrete Furnish/Placement, Waterworks Supply, Specialty Plant Piping, Painting and Coating’s. Disadvantaged Business Enterprise (DBE) participation is encouraged. Plans and Specifications are available for viewing at our office or can be viewed/obtained at South Tahoe Public Utility District. Bidders can contact Star Glaze at 530-543-6205 for assistance in downloading the plans and specifications at http://www.planetbids.com/portal/portal.cfm?CompanyID=21516
Our firm will consider dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by DBE's in the competitive process. Our company will also consider consortium of DBE's should a contract be too large for firms to handle individually. We are an Equal Opportunity Employer. 100% Performance and Payment Bonds may be required for the full amount of the subcontract price. Subcontractor's must possess a current Contractor's License and DIR registration number. Insurance and Worker's Compensation coverage meeting Vinciguerra Construction's Subcontract. Quotation must be valid for the same duration as specified for the owner for award. Please call to discuss any questions or if you should need any assistance in obtaining bonding, insurance, equipment, materials and/or supplies necessary to participate in this project.
Austin Vinciguerra
Austin Vinciguerra
Telephone
(209) 223-3610
(209) 267-9053
Address
P.O. Box 157
Sutter Creek, CA 95685
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »