DBEGoodFaith.com


is seeking qualified DVBEs

Project Name

LVJUSD- HVAC Replacement 2023 Project (6 Project Sites)


Bid/Contract #

TBD


Awarding Agency

Livermore Valley Joint Unified School District


Project Location

5757 Haggin Oaks Ave, Alameda County, CA


Bid Date

04/04/2023 at 14:00


Project Details

Provide HVAC Replacement work and associated trades at six campuses. Christensen Middle School work shall occur over Summer 2023. All other campus work shall occur Summer 2024. Bid Packages shall include the following: General Requirements, Selective Demolition and Abatement, Concrete, Rough Carpentry, Finish Carpentry, Joint Sealants, Glazing, Cement Plaster Repair, Metal Stud Framing and Drywall, Acoustical Ceilings, Paint, Window Coverings, Fire Suppression, Mechanical, Electrical, and Pavement Striping and Signage.


Bid Requirements:

This project requires prevailing wages be paid, pursuant to California Department of Industrial Relations Prevailing Wage Requirements. Certified Payroll will be required.
Flint requires that all subcontractors have and maintain a valid and active California State Contractor’s license at the time of bid and throughout the duration of the project while under contract to perform their scope(s) of work.
All subcontractors submitting bids on Public Works Projects must be registered with the California Department of Industrial Relations.
Flint requires a Waiver of Subrogation from all successful subcontractors.
Flint requires a completed prequalification questionnaire from all subcontractors prior to issuance of a subcontract. This information can be found in the Front End Bid Documents.
Flint’s Standard Form of Agreement (Subcontract) will be used for this project. Execution of Subcontract is required by all successful bidders. A copy of Flint’s Subcontract is available in the Front End Bid Documents.
Bonding: Not required for subcontractors who are prequalified with Flint.
Submission of a bid or proposal to Flint represents an acknowledgement that the bidding entity has reviewed all of the bid documents, including addenda.
Disadvantaged subcontractors and vendors certified by the State of California and/or US Federal Government are strongly encouraged to submit bids.
This project includes a 3.0% DVBE goal for subcontractors and Material Suppliers.
This project includes Skilled and Trained Work Force requirements per CA Public Contract Code.
Flint is an Equal Opportunity Employer. We will consider all subcontractor and supplier bids regardless of race, sex, color, age, religion, gender, disability, ethnicity or national origin.
Flint is signatory to the Carpenter and Laborer Unions.

Email bidding@flintbuilders.com for access to planroom.

Get in Touch

Outreach Coordinator


Telephone

(916) 757-1009


Fax

(916) 797-7400

Address

401 Derek Place
Roseville, CA 95678


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »