DBEGoodFaith.com


Login
Sign Up

is seeking qualified DBEs, MBEs, WBEs, SBEs, SBA MBEs, HUBZone, SBRA, LSAF & HUB

Project Name

Sanitary Sewer Force Main to Hollister Project


Bid/Contract #

--


Awarding Agency

City of San Juan Bautista


Project Location

San Juan Bautista and Hollister, San Bentio County, CA


Bid Date

06/02/2023 at 14:00


Project Details

Anderson Pacific Engineering Construction, Inc. is requesting subcontractor and material supply quotes from qualified and certified Disadvantaged Business Enterprise firms (including MBE, WBE, SBE, SBRA, LSAF, & HUB). Item for the project includes, but is not limited to; demo, surveying, staking, dewatering, SWPPP, earthwork, hydroseed, trenching, fencing, traffic control, painting, misc. piping, HDPE pipe, AC Paving, AC curb, manhole, filter fabric, concrete, rebar, misc. metals, structural steel, striping, pumps, valves/fittings, bypass pumping, sump pumps, waterproofing, clearing & grubbing, davit crane, generator, fiber optic, electrical, instrumentation, trucking.


The Project may be funded in whole or part by the U.S Department of Agriculture Rural Development (USDA), EPA through the California State Water Revolving Fund (CSWRF), which requires compliance with American Iron and Steel, Davis Bacon prevailing wage rates requirements and Build America Buy America (BABA). Please contact APEC for assistance with bonding, lines of credit, insurance, necessary equipment, supplies or materials. EOE.

Plans can be viewed at:
Anderson Pacific, 1370 Norman Ave., Santa Clara, CA 95054 by appointment or downloaded from:
https://www.dropbox.com/scl/fo/m65sl5ml98sqokrih63t6/h?dl=0&rlkey=rjwdcyg8nrv5coro6ryk8mzno

Submit Quotes to:
Anderson Pacific Attn: Estimating - Phone: 408-970-9900 �" Fax: 408-213-0532 �" Email: estimating@andpac.com

NOTE: *** All quotes must be per “plans and specifications,” unless otherwise noted. An EPA 4500-3 DBE Subcontractor Participation Form must be submitted with scope/quote. ***

Project Description: The project includes: constructing a force main extending from the San Juan Bautista WWTP to the Hollister Domestic WWTP, installing a new Primary Pump Station, making improvements to the existing influent pump station to serve as the Storage Pump Station, making improvements necessary to drain the emergency storage basins, demolishing existing San Juan Bautista WWTP equipment, installing a Chemical Feed System, site grading, yard piping and electrical and instrumentation. The Engineer’s estimate is $14,400,000.

Get in Touch

Outreach Coordinator

Estimating Department


Telephone

(408) 970-9900


Fax

(408) 213-0532

Address

1370 Norman Avenue
Santa Clara, CA 95054


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »