DBEGoodFaith.com


Company Logo

is seeking qualified DBE, SBE, WBE, and MBE subcontractors and vendors that are certified with any appropriate directory with NAICS / product code(s) and have registered with Amtrak on their procurement website https://procurement.amtrak.com prior to bid date.

Project Name

East River Tunnel Rehabilitation


Bid/Contract #

X036-23205


Awarding Agency

AMTRAK


Project Location

New York, New York County, NY


Bid Date

12/13/2023 at 14:00


Project Details

The East River Tunnel Rehabilitation Project will restore the two tubes that were damaged by Superstorm Sandy. The work will modernize the tunnel infrastructure, improving safety, reliability, and security and bring the systems to a state of good repair. The project will involve demolishing the existing tunnel systems down to the concrete liners, followed by reconstructing and modernizing all tunnel systems. (source: https://www.amtrak.com/east-river-tunnel-rehabilitation-project)

For this Project, East River Connect (“ERC”) a Joint Venture between Barnard Construction Company, Inc. and Iovino Construction Partners JV is soliciting for all scopes of work on the project including but not limited to supply and install of: safety, scheduling, quality and testing, staffing, photography, construction noise and dust control, construction fencing, sanitation facilities, site security, temporary offices, office supplies, cleaning, survey, small tools, construction equipment and supplies, general construction, traffic control, site clearing, drilled shafts and micropiles, tunnel instrumentation, saw cutting, trucking, demolition, hazardous materials remediation and disposal, asbestos remediation, lead containing materials remediation and disposal, environmental compliance, water treatment, cast-in-place concrete, reinforcing steel, ready-mix supply, concrete pumping, precast concrete, tunnel leak repair, structural steel, miscellaneous metals, doors and hardware, louvers, epoxy coatings, signage, fire extinguishers, Fire Suppression, Fire Life Safety, Plumbing and Drainage, HVAC, Electrical, Communications, Electronic Safety and Security, track and signal, third rail, Overhead Catenary System, SCADA, stray current monitoring, startup and commissioning, Earthworks, paving, fencing and gates, and all other scopes of work.

We advise all interested subcontractors and vendors that the scope letter and preliminary schedule should be provided not less than 2-3 weeks before the Owners’ Bid Date and the final pricing proposal including schedule should be provided not less than 1 week before the Owners’ Bid Date. To request Bid Documents, discuss opportunities, seek assistance, or to submit a scope letter, proposal, or schedule please visit www.eastriverconnect.com. Navigate to the Interested Vendors and Subcontractors - How to Get Involved section or contact our team:

Eric Taylor, Outreach Coordinator at (406) 586-1995 or eric.taylor@barnard-inc.com
Mirsada Duli, Estimate Controls Manager at (646) 813-6440 or mduli@iovinoent.com


This Project is subject to the requirements of a Project Labor Agreement (PLA). This Project also includes an Owner Controlled Insurance Program (OCIP). For details regarding the PLA & OCIP please refer to the Bid Documents.

Get in Touch

Outreach Coordinator

Mirsada Duli


Telephone

(646) 813-6440


Fax

(718) 357-4831

Address

1010 Northern Blvd #200
Great Neck, NY 11021


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Northeast Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »