For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
Biological Nutrient Removal Improvements Package #3 - BNR and UV Improvements
233370
City of Wichita, KS
Wichita, Sedwick County, KS
02/22/2024 at 15:00
Scopes include, but are not limited to: Asbestos Remediation, Lead Remediation, Demolition, Earthwork, Dewatering, Earthwork Shoring, Asphalt Paving, Concrete Paving, Turf and Grasses, Concrete Repair, Concrete Finishing, Rebar Installation, Precast Concrete, Masonry, Architectural Cabinetry, Roofing, Waterproofing, Joint Sealants, Fireproofing, Doors, Overhead Doors, Windows, Glazing, Gypsum Board, Metal Framing, Resinous Flooring, Acoustical Ceiling, Painting, High Performance Coatings, Metal Laboratory Casework, Metal Buildings, Bridge Cranes, Monorail Hoists, Plumbing, HVAC, and Electrical and Instrumentation.
Participation goals for this project are: 7.9% MBE and 6.9% WBE
If you are able to receive bid documents electronically, they are available for download on Garney's Online Plan Room - https://app.buildingconnected.com/public/547f7bd4e3bfa10500b559ad/projects/65a04d6b04219a00356a9682
Audrey Schultz
Dave Farkas
Telephone
(816) 741-4600
(816) 278-5912
Address
1700 Swift Street
North Kansas City, MO 64116
The U.S. Department of Transportation-supported Central Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »