For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
John Madden Football Operations Center
DESIGN BUILD Pre-Engineered Metal Building
Hensel Phelps
San Luis Obispo , San Luis Obispo County, CA
02/20/2024 at 04:00
WE ARE REQUESTING PRE-QUALIFICATIONS FROM
SUBCONTRACTORS INCLUDING SMALL BUSINESSES, WOMEN-OWNED SMALL BUSINESSES, VETERAN OWNED SMALL BUSINESSES, AND DISABLED VETERAN OWNED SMALL BUSINESSES
FOR THE FOLLOWING SCOPES OF WORK:
DESIGN BUILD �" Pre-Engineered Metal Building
Hensel Phelps Construction Co. seeks responses to a Request for Qualification (RFQ) from prospective Bidders interested in Bidding the DESIGN BUILD �" Pre-Engineered Metal Building for the Cal Poly San Luis Obispo �" John Madden Football Operations Center project.
The John Madden Football Operations Center will be an approximately 33,000 sq.ft two-level, steel and concrete framed structure with traditional glazing and exterior finish systems. This is a public works project and has a direct construction value of $30,000,000.
The PEMB will consist of a standalone 7,000 square feet structure located adjacent to the JMFC.
The delivery method for this project is Collaborative Design-Build. This is a two-phased project delivery process: Phase 1 �" Design and Preconstruction Services, Phase 2 �" Design Assist / Design-Build Construction Services. There will be a separate agreement for each phase.
The scope of work may include, but is not limited to, the following:
Preconstruction / Design Build Services - As experts in their field, the Design Build trade partner will review and provide comments to the team with respect to their scope for a complete, fully coordinated, and functional system.
Construction Services (Target Value Cost) - Trade partner selected will provide all necessary management, submittals, coordinated shop drawings, services, labor, materials, tools, supplies, equipment, testing, and/or any other act or thing required to fully perform and complete their scope of work described and/or inferred in the Contract Documents.
The project is to be designed and constructed to meet LEED Gold or equivalent energy and sustainability achievements.
Pre-construction is scheduled to begin mid-February 2024. Construction is scheduled to begin April 2024.
Pre-qualification documents will be available the week of February 5, 2024. If you are interested in receiving a form, please email John Proctor (jproctor@henselphelps.com).
Requests for Proposals, and the basis of design for the project will be available to pre-qualified bidders the week of February 20, 2024.
Applicants must fill out the pre-qualification forms completely. All pre-qualification forms must be submitted to Hensel Phelps Construction Co. (Attn: John Proctor) no later than the date listed above.
100% Payment and Performance Bonds are required for amounts over $100,000. Any subcontractor that cannot provide Payment and Performance Bonds for this project can contact our office at 925-494-9700 to discuss available options. Workers’ Compensation and Waiver of Subrogation will be required by all Subcontractors.
WE ARE AN EQUAL OPPORTUNITY EMPLOYER
Jennea Lutz
(925) 494-9700
(000) 000-0000
Address
4750 Willow Road, Suite 100
Pleasanton, CA 94588
The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »