For Primes & Gov't
For DBEs, VetBiz, etc.
100% US-based
GDC Palisades Tunnel
GDC23-004
Gateway Development Commission
North Bergen, Hudson County, NJ
06/13/2024 at 14:00
We require all subcontractors quote with union labor. We note that there is a diversity goal of 16.7% DBE Participation.
Asbestos Abatement
Asphalt Milling & Paving
BIM
Clearing & Grubbing
Concrete
Concrete Pumping
Cranes
Dewatering
Electrical
Erosion Control Materials
Falsework
Fence
Formwork
Geotechnical Drilling
Ground Stabilization
Jersey Barrier Wall
Landscaping
Noise Wall
Pavement Markings
Pest Control
Photography
Precast
Rebar
Scheduling
Security
Signage
Support of Excavation
(Tieback Anchors & Secant Walls)
Survey
Sweepers/Vacuums
Testing & Inspecting
Traffic Control
Trucking/Disposal
Utilities
Vibration Instrumentation & Control
Water Treatment
Walsh/Skanska/Traylor JV is soliciting cost proposals for the Gateway Development Commission Palisades Tunnel Project.
One of Three Gateway Tunnels between NY and NJ - New Jersey Tunnels. This project involves a twin tunnel 28 ft Dia in hard rock approx. 5000 ft each, between North Bergen and Hoboken. There will be a 125 ft dia shaft 95 ft deep and a portal open cut for the TBM launch. It also has 6 cross passages. The Palisades Tunnel, which consists of two separate tunnels, each approximately 5,100-feet long and with an inside diameter of 25 feet 2 inches, is to be excavated by Tunnel Boring Machines (“TBMs”).
We require all subcontractors quote with union labor. We note that there is a diversity goal of 16.7% DBE Participation.
Please email rguma@walshgroup.com or nynjestimating@walshgroup.com to receive a link to the project plans and specifications.
Colette Slaman
Riley Guma
Telephone
(201) 691-6000
(201) 691-6001
Address
150 Clove Road, 11th Floor
Little Falls, NJ 07424
The U.S. Department of Transportation-supported Mid Atlantic Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.
Learn more »