DBEGoodFaith.com


Company Logo

is seeking qualified DBEs

Project Name

HMA, Cold Plane AC Pavement, Roadway Excavation, Class 2 Agg Base


Bid/Contract #

03-0J01U4


Awarding Agency

Caltrans


Project Location

Tahoe City, Placer County, CA


Bid Date

09/05/2024 at 02:00


Project Details

LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, CHANNELIZER, TRAFFIC DRUM, TEMP PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, AUTOMATED FLAGGER ASSISTANCE DEVICE DAY, JOB SITE MANAGEMENT, LAKE TAHOE SWPPP, RAIN EVENT ACTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), TEMP MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, MONITORING, REPORTING), TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, SHOULDER BACKING, PINE NEEDLE MULCH, DRY SEED, ROLLED EROSION CONTROL PRODUCT, COMPOST, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, DATA CORE, PLACE HOT MIX ASPHALT DIKE, PLACE HOT MIX ASPHALT, TACK COAT, REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, STRUCTURAL CONCRETE, CONCRETE BACKFILL, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE, SLOTTED CORRUGATED STEEL PIPE, CORRUGATED STEEL PIPE ARCH, PERMEABLE MATERIAL, ALTERNATIVE FLARED END SECTION, ALTERNATIVE FLARED END PIPE ARCH SECTION, ABANDON CULVERT, REMOVE GRATED LINE DRAIN, REMOVE CULVERT, REMOVE SLOTTED DRAIN, REMOVE INLET, REMOVE FLARED END SECTION, ADJUST FRAME & COVER TO GRADE, MODIFY INLET, CLEANING, INSPECTING, AND PREPARING CULVERT, CULVERT SLURRY-CEMENT BACKFILL, CURED-IN-PLACE PIPELINER, CONCRETE (CONCRETE APRON), REMOVE DECORATIVE PAVERS, DECORATIVE PAVERS, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, DETECTABLE WARNING SURFACE, MINOR CONCRETE (CURB, GUTTER, SIDEWALK), REMOVE CONCRETE (CURB, GUTTER, SIDEWALK), PRE/POST CONSTRUCTION SURVEYS, MISC IRON & STEEL, SURVEY MONUMENT, RECONSTRUCT WOOD FENCE, SNOW POLE MARKER, (REMOVE, FURNISH & INSTALL) ROADSIDE SIGNS, MIDWEST GUARDRAIL SYSTEM, TRANSITION RAILING, END CAP, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL, REMOVE GUARDRAIL, POLYMER CEMENT PAVEMENT MARKING, REMOVE TRAFFIC STRIPE, METHYL METHACRYLATE PAVEMENT MARKING, METHYL METHACRYLATE PAINT TRAFFIC STRIPE, METHYL METHACRYLATE PAINT TRAFFIC STRIPE CROSSWALK AND PAVEMENT MARKING, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TRAFFIC MONITORING STATION SYSTEM, RECTANGULAR RAPID FLASHING BEACON SYSTEM, MODIFYING ROADSIDE WEATHER INFORMATION SYSTEMS, MODIFYING AUTOMATIC VEHICLE CLASSIFICATION SYSTEMS, MODIFYING SIGNAL & LIGHTING SYSTEMS, REMOVE TRAFFIC MONITORING STATIONS


Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. If your company is subject to the Air Resources Board Off-Road Diesel Vehicle Regulation please include your Certificate of Compliance with your quote. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Get in Touch

Outreach Coordinator

Cassie Coppini


Project Estimator

Kody King

Telephone

(707) 443-6371


Fax

(707) 443-0277

Address

P.O. Box 1006
Eureka, CA 95502


Send Message »


Free DBE Resources

Procurement, Capital Access, & Surety Bond Assistance

The U.S. Department of Transportation-supported Southwest Region SBTRC helps DBEs with Procurement, Capital Access, and Surety Bond Assistance - and much more - at no cost.

Learn more »